WebCanceled Plan B11-69. 4/15/2024. California ST-10 Bridge Rail (Sheet 3 of 3) Canceled Plan B11-70. 4/15/2024. Reinforced Concrete Crib Wall - Types A, B and C. Canceled Plan C7A. 10/19/2024. Reinforced Concrete Crib Wall - Types A, B and C - Header and Stretcher Details. WebJul 15, 2024 · of an existing retaining wall unless the existing retaining wall was designed for the transfer of vehicular impact loading, and -if so- the top of the existing wall will need to be removed and replaced due to the need for the extra hooks and reinforcement. If Concrete Barrier type 85 is desired as a bridge railing at the top
RETAINING WALL TYPE 6 (CASE 1) REVISED …
Web• Retaining Walls – Type 1, 1A, 5 and 6 • Crib Walls – made of reinforced concrete or steel ERS that appear as Bridge Standard Details are • Retaining Walls – Type 7 ... performance, such as member deformation (e.g. the stem deflection on a Type 1 wall), cracking, temperature, and shrinkage requirements (in the case of the standard ... WebWall-Type and Condition . Resistance Factor ; Nongravity Cantilevered and Anchored Walls Axial compressive resistance of vertical elements ; Article 10.5 applies Passive resistance of vertical elements . 1.00 : Pullout resistance of anchors (1) •Cohesionless (granular) soils •Cohesive soils •Rock organ in upper right abdomen
Standard Plans User Guides Caltrans - California …
WebGeneral Information. The User Guides listed below are developed and maintained by the Division of Engineering Services (DES) Technical Organization to assist with design and … WebA Ground Anchor Wall Construction Checklist is presented in Appendix K-6 to assist field personnel in preparing documents and inspecting fieldwork to ensure compliance with contract documents. The contract specifications. 2. state the requirements for performance and proof testing of sub horizontal ground anchors. WebSound wall types include masonry block, precast concrete panels, and alternative sound wall systems. 4-5802 Before Work Begins. Before work begins, do the following: Review the plans and specifications covering sound walls. Verify that all required submittals are provided by the contractor and processed as specified. organ in throat