Cultec 330 chambers
WebCULTEC Heavy Duty (HD) chambers must be used for any traffic applications. CULTEC Heavy Duty chambers have a colored stripe permanently affixed along the full length of the chamber. These models listed that do not have a stripe must not be used for traffic applications. All dimensions are nominal.
Cultec 330 chambers
Did you know?
WebSeptic Chambers. Print ... Cultec. Recharger® 330XLHD 7 ft. Recharger End Unit. Part #C330XLEHD Item #3619789 Manufacturer Part #C330EHDXL. Call for Pricing. … WebSpecifications 1 2 3 4 The Recharger® 360HD is a 36″ (914 mm) tall, high capacity chamber. Typically when using this model, fewer chambers are required resulting in less labor and a smaller installation area. The Recharger® 360HD has the side portal internal manifold feature.
WebThe open bottom and perforated sidewalls of CULTEC chambers maximize infiltrative area and allow for sizing reductions in most states. Design Assistance Our Technical … Web878 Federal Rd, P.O. Box 280 Brookfield, Connecticut 06804 USA Phone: 203.775.4416 Toll Free: 1.800.4.CULTEC Fax: 203.775.1462 Email: [email protected]
WebDue to their greater contact area, CULTEC chambers are commonly allowed to reduce the overall system sizing requirements up to 50% when approved by the local authority. The Recharger® 330XLHD is a 30.5″ (775 mm) tall, high capacity chamber. Typically when using this model, fewer chambers are required resulting in less labor and a smaller ... WebCONTACTOR ® 100HD. The Contactor® 100HD is a 12.5″ (318 mm) high, low profile chamber and is typically used for installations with depth restrictions or when a larger infiltrative area is required. The Contactor 100HD has …
WebMar 31, 2016 · Trade name of technology: CULTEC Chambers; model: Field Drain Contactors C4; Contactor EZ-24, 100, 125, and 202; and Recharger 180, 280, and 330XL (hereinafter the "System"). Schematic ... Recharger 330 7.2 4Effective Leaching area is equal to 1.67 times bottom width only. 5. For new construction or an upgrade, the …
WebCULTEC Contactor ® and Recharger ® septic chambers replace conventional pipe and stone or concrete leachfields. They may be installed in trench or bed configurations according to acceptance by local … dick whittington pantomime nottinghamWebOct 25, 2006 · CULTEC's Recharger 330 HD stormwater chambers were chosen for cost effectiveness and ease of installation. The chambers' purpose was two-fold -- first, to … dick whittington pantomime storyWebSpecifications 1 2 3 The Recharger ® 20.5″ (521 mm) tall, mid-size stormwater management chamber and is typically used for installations with depth restrictions or when a larger infiltrative area is required. The … city center on 7 pembroke pinesWebCULTEC Products - CULTEC, Inc. Stormwater Products Plastic chambers Water quality filters Header systems Stormwater System Accessories These products may be used for subsurface retention, detention, recharging and controlling the … city center one east bankomatiWebMar 30, 2024 · The Recharger® 330XLHD is a 30.5″ (775 mm) tall, high capacity plastic stormwater management chamber. Typically when using this model, fewer chambers are … city center one instagramWebStraight Line Deflection of CULTEC Chambers The patented overlapping rib connection used by CULTEC’s Contactor®, Recharger and Field Drain™ chambers permit a curved line of installation. This is a beneficial quality when following land contours or when a sweep around an obstruction is necessary. Contactor®EZ-24 Special Flex Design city center of florence italyWebJul 21, 2014 · Two CULTEC StormFilter 330 units filter runoff before it enters a CULTEC Separator Row. The StormFilter 330 is a chamber-shaped secondary filter which contains two removable pass-thru filters. … dickwhittingtonpark.co.uk